For any questions relating to any of these Tenders please email the Procurement Department at procurement@tasrail.com.au.
- Fingal and Woodbury Drainage improvements
- Western Junction Signals Upgrade
- Chester Bridge Rail and Transom Works
- Rectification of Rail Defects (Melba Line)
- Rhyndaston Tunnel Chimney Rehabilitation
- Duplicate of South Line Track Works Including Bridgewater to Boyer
- IIP Minor and Short Notice Track Works Panel
- Turnout Replacement - Western Junction
- Construction of an Under Floor Wheel Lathe Building and Associated Civil Works
- Design, Manufacture and Supply Track Geometry Monitoring Equipment
- IIP Crossing Upgrades – South Burnie & on the Melba Line
- Periodic Provision of Road Rail Plant with Operators
- Periodic Weed and Vegetation Control by Spraying
- Longford Truss Bridge Strengthening
- Insurance Services
- Level Crossing Condition Monitoring
- Rectification of Rail Defects
- Periodic Supply of Quarry Materials
- IIP Rehabilitation of 15 Culverts
- IIP Western Line Rail Crossing Upgrade
- Transport of IIP Rail and Sleepers
- Melba & Western Line - Track Works
- Rehabilitation of Two Culverts
- Re-sleepering and Re-railing of Track Sections
- Specialist Laundry Services
- Parattah Rail Siding - Retaining Wall Replacement (Now closing 30 April 2019)
- Coastal Erosion Works 19/20
- Track Works Defect Removals 19-20
- RFF Siding Works- Bell Bay
- Rhyndaston Tunnel Remediation
- IIP2 Formation Renewals 19/20
- IIP2 Turnout Installation and Repairs 20-21
- On Track Mechanical and Land Maintenance Services
- Design and Construct Minerals Shiploader
- Supply of Composite Sleepers and Bearers
- State-wide Rail Flaw Defect Removal
- Level Crossing Surface Renewals 2021
- Installation of Rail Underpass Culverts
- Fabrication of TFAF Wagon End Gates
- Supply of Personal Protective Uniforms
- Melba Line Re-Railing
- Centralised Lone Worker System
- South Line Side Worn Rail Removal
- RF0215 Periodic Supply of Quarry Materials
- Bell Bay Line Trackwork
- Penguin Civil Works and Pedestrian Crossings
- Penguin Coastal Erosion and Slip Work
- Passive to active level crossing upgrades
- South Line Track Works P1
- Off track mechanical and land maintenance services panel